01 / Describe the vehicle
Provide platform, year, axle position and current tire markings. For replacement work, include the applicable OE reference or VIN where available so the interface can be reviewed.
Technical services
A structured path from application requirements to a documented tire selection.

Each program begins with the operating conditions and the decisions the team needs to make. The following service areas can be discussed according to the project scope; the deliverable and responsibilities should be agreed before work begins.
| Service area | Inputs and review |
|---|---|
| Application matrix | Vehicle, tire size, axle position, loads, speed and climate establish a comparable selection basis. |
| Standards mapping | Identify the product family and destination market before evaluating which requirements and documents apply. |
| Validation planning | Discuss samples, laboratory or road duty cycles, acceptance criteria and the reporting needed for review. |
| Fleet supply planning | Align replacement timing, regional stock expectations and service arrangements with operating plans. |
| Total cost review | Compare rolling resistance, wear, downtime and inventory under the stated operating conditions. |
Provide platform, year, axle position and current tire markings. For replacement work, include the applicable OE reference or VIN where available so the interface can be reviewed.
Specify typical and peak loads, speeds, surfaces, climate and expected mileage. These details prevent a highway use case from being treated as equivalent to mixed-surface operation.
Choose relevant tests and define how results will be interpreted. Standards and approvals are checked against the specific product and destination rather than assumed across a range.
Compare the evidence against the original brief, record open questions and decide whether the candidate, duty cycle or acceptance criteria need adjustment.
Bring your application brief and the decisions you need to make.